Building Information Modeling (BIM) Service - Bandung
Documents Submission List:
Level of Design (LOD) 100-400
- LOD 100 - Pre Schematic; Existing Condition Model, Site Analisys, Space Program, Design Authoring - Volumetric Model, Zoning and Orientation
- LOD 200 - Schematic; Design Authoring - Prelimenary Model, Sustainability (LEED) Evaluation, Programing, Phase Planning, Preliminary Cost Estimate (Square Footage), Design Review, Preliminary 3D Coordination
- LOD 300 - Design Development; Design Authoring - Model, Sustainability, (LEED) Analisys, Detail Energy Analisys, System Cost Estimates, 3D Coordination Reporting, Program Validation
Model Structure: 3D Model, BIM Views, Assembly/Compilation & Issue/Publication

Loading ...
